Also, the main water line will need to be brought from the service to the area where the meter will eventually be placed. This means all of the drains will be hooked up to the main service and any basement bathrooms for the future will need to be installed at this point. (You would need to check with the city to make sure this is doable.)ĭuring the underground rough-in phase, a plumber locates all the supply and waste connections from the building system to public utilities, and establishes where these systems will enter or leave the building. Once the walls are poured for the basement, the groundwork can be installed, inspected, and then buried.Īt the same time as the rest of the rough-in plumbing. In new home construction there are two points when the groundwork can be done: What can be regarded as the fourth phase of plumbing projects? Service and maintenance. A home plumbing installation isn’t completed all at once but in 3 stages, to be exact:Īboveground rough-in phase (top-out or stack-out)įinishing phase (Trim-out or trim finish) This article is about the different stages of plumbing that happen in new home construction, renovation, or basement development. As with so many areas of construction and renovation, there are certain stages that are required to be completed prior to moving on. If you’re building a new home or any type of establishment, you know that you’ll need to install plumbing. Installing new plumbing in a house? Here are the 3 stages to successful pipe installation
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |